The reserved capacity is being cancelled.

Have you heard the news yet? The Energy Regulatory Office (ERÚ) has decided to overhaul the tariff structure for the transmission and distribution systems at the extra-high voltage (VHV) and high voltage (HV) levels, effective January 2027. What does this mean?
The “Reserved Capacity” (RK) metric is being eliminated. Instead, connection fees will be calculated based on “Reserved Power Input” (RP) and “Maximum Power Draw” (PMAX). PMAX will be defined as the highest value of the 15-minute (quarter-hourly) peak recorded during the billing period.
Each month, the distributor will calculate tariff coefficients T1 and T2 and automatically use the one with the lower value for billing purposes.
A unified fee will now apply to any excess over the reserved power input or reserved power capacity. The penalty for exceeding the RP will be fixed at four times the price of the reserved power input under tariff T1, in accordance with the current ERÚ price decree. For example, if I have a contracted RP of 1,200 kW and my PMAX reaches 1,300 kW during the month, I will pay a penalty on the difference—i.e., 100 kW.
Penalties for failing to meet power factor requirements currently apply; however, there is a proposal to abolish this penalty as well, though not until January 1, 2028.
And how will the calculation work?
The current calculation is based on the Reserved Capacity (RK) value. For instance, a heat-treatment plant has a contracted RK of 1,200 kW. Under the current calculation, it pays an annual…
Pro RK 1 200 kW:
RK 1,2 x 252 565 = 303 078 Kč/month = 3 636 936 Kč/year
Under the new system—though I should note that the exact rates have not yet been set—the price is calculated according to this model:
Model T1
RP = 1200 kW, PMAX measured for the billing period was also 1,200 kW:
T1 1 200 x 190 + 1 200 x 19 = 250 800 Kč/month = 3 009 600 Kč/year
Model T2
T2 1 200 x 22 + 1 200 x 227 = 298 800 Kč/month = 3 585 600 Kč/year
The lower value from tariffs T1 and T2 is invoiced—specifically, CZK 3,009,600 per year. As shown above, the connection cost calculated based on the T1 or T2 model is lower than the current cost. The entire system can be modeled as follows:
Model T1 favors higher RP and penalizes PMAX less, whereas Model T2 has a low price for RP but is highly sensitive to PMAX. Therefore, if we have control over PMAX—specifically through quarter-hourly peak demand measurement—and manage to reduce this peak to, say, 850 kW, the cost will be as follows:
T1 1 200 x 190 + 840 x 19 = 243 960 Kč/month = 2 927 520 Kč/year
T2 1 200 x 22 + 840 x 227 = 217 080 Kč/month = 2 604 960 Kč/year
The amount being invoiced is 2 604 960 Kč.
As of January 1, 2028, the ERÚ will completely abolish the current “power factor penalty” and instead directly charge for the unwanted consumption or supply of reactive energy in individual 15-minute intervals. However, the new penalty scheme has not yet been presented by the ERÚ.
=======================================================================================================
Are you solving a similar problem? I will help you with the analysis…
40+ years of experience in the field
30+ years of experience… HT-PROGRES, Bodycote, Galvamet
cooperation… VŠB, Czechimplant, ECM Technologies, TAV Vacuum Furnaces, GHC Invest
12+ years of expert activity
Want to ask for a solution or want a non-binding consultation? Click on this link, I will usually respond within 24 hours. Contact email
========================================================================================================
Jiří Stanislav, Ing. CSc.
Consultant and forensic expert
========================================================================================================
24/9/2026